LINE IT or LOSE IT!


Irrigation Canal Repair - Central Washington

The irrigation district discovered in late February that an aging liner had failed and was not repairable. The canal passes over a creek culvert in this area and it is critical that the canal water does not seep into the creek. Only five weeks remained to get the material manufactured, shipped and installed before water on.

The factory broke schedules and shipped the liner in two weeks. It was installed in three days including a rain delay. Below are before and after photos of this project.

Upstream End of Canal Section Lined


Downstream End of Check Structure in the Canal



Downstream End of Canal Section Lined